Market Sector
Education
Structural Engineer
Hydrock
Location
Salisbury
Appointment Type
RIBA Stage 4b Design
Client
VME Mechanical & Electrical Services
Architect
DKA
The proposal included a two-storey
structure featuring a double-height hall, a drama and activity studio, staff
facilities, changing rooms, a music classroom, and dedicated practice areas —
all designed to support a diverse and modern curriculum.
The project presented several M&E
challenges that were collaboratively addressed by the design team, including
the development of a compliant ventilation strategy in line with BB101 guidance
to ensure appropriate indoor air quality and thermal comfort.
The scheme benefited from a strong and cohesive professional team, capable of
making timely and effective decisions to maintain progress and ensure the
programme remained on track.
Services used in this project
Mechanical, Electrical and Public Health Building Services Engineering Design
Project Feasibility and Planning
Performance Duties - Specification and Drawings
Full-Detailed Design - Specification and Drawings
Lighting Design
MEP Infrastructure Design
Energy Calculations and Strategies
Thermal Modelling and Overheating Assessments
BIM (Building Information Modelling)
Low-Carbon Technology Design
M&E Condition and Energy Surveys
Tender Documentation, Breakdown and Analysis
Site Inspections and Construction Monitoring
Audio Visual Performance Design
Lift Performance Specification