Located in Bournemouth, Poole, the project comprised the construction of a new mess area on the third floor of the existing hospital building.


Market Sector
Healthcare

Structural Engineer
GAP Ltd

Location
Bournemouth

Appointment Type
RIBA Stages 3-6

Client
Stepnell Ltd

Architect
Studio Four Architects


The new facility included a lounge and dining area, kitchen, WCs, a study zone, and a dedicated rest area — all designed to provide a comfortable and functional environment for junior doctors during their shifts.

Cooper Homewood were appointed to deliver RIBA Stages 3-6.

Our involvement included the preparation of fully detailed and coordinated working drawings to support the construction phase. In addition to the core design services, Cooper Homewood also offered optional post-design support in the form of site inspections and reporting, undertaken by our engineers during RIBA Stages 5 and 6, to ensure quality and compliance were maintained throughout the build.




Services used in this project

Mechanical, Electrical and Public Health Building Services Engineering Design

Full-Detailed Design - Specification and Drawings

Lighting Design

Thermal Modelling and Overheating Assessments

BIM (Building Information Modelling)

Low-Carbon Technology Design

Contact us about this project.

London Office

The Foundry Business Centre
156 Blackfriars Road, Southwark, London SE1 8EN

T: 02071 990 359

Find us

Fareham Office

Ailsa, 3 Turnberry House
4400 Parkway
Solent Business Park
Whiteley
Fareham
PO15 7FJ

T: 01489 346 700

Find us

Bournemouth Office

Suite 3
Colonnade House
2 Westover Road
Bournemouth
BH1 2BY

T: 01202 078 130

Find us

Company No. 07627650
VAT Registration No. 112683335

View our Privacy Statement View our Quality Management System Policy